Friday 26 April 2013

Summerhouse update

An early start to the day was required to go and pick up the summerhouse with brother John and a tipper lorry.
We arrived at Yateley by 8am and loaded the bits without incident , and then arrived back at  the Lottie by 10am.
Fortunately the Lottie car park was empty so turning the lorry was no problem and we were able to quickly off load. In fact everything went like clockwork!

After lunch we set about the rebuild and by 6.30pm it was pretty much erected, with the exception of the roof which needs some repair work.
I was also able to put together the decking.


A closer shot showing the decking, it just needs a good scrub and it will look the biz.

Had enough decking board to put an edging piece along the front edge

A final shot taken as I departed for home, showing the left hand window with a new pane of glass

1 comment:

  1. Absolutely amazing progress!! It just looks fabulous!

    ReplyDelete